A hydropower renewable energy project with a capacity of 230 MW. Located in Mossendjo, Niari, Republic of the Congo. Current status: shelved – inferred 2 y.
A hydropower renewable energy project with a capacity of 150 MW. Located in Pool Department, Republic of the Congo. Current status: cancelled – inferred 4 y.